There is no single price for renovating a Sydney home. Two projects with the same floor area can have very different costs because the existing structure, access, design complexity, finishes and approvals are rarely identical.
Published Sydney guides in 2026 commonly place substantial renovation work within broad per-square-metre ranges. Those figures are useful for early planning, but they should not be treated as a quotation. A builder needs drawings, a defined scope and information about the property before providing a reliable price.
Indicative renovation ranges
The following ranges are a broad planning reference compiled from Australian industry cost guides available in 2026. Actual quotations can fall below or above them.
| Project level | Broad planning range | Typical scope |
|---|---|---|
| Cosmetic refresh | Approximately $1,000–$2,000 per m² | Painting, floor finishes, light joinery and limited fixture replacement without significant structural work. |
| Mid-range renovation | Approximately $2,000–$3,500 per m² | More extensive kitchen or bathroom work, services upgrades and moderate layout changes. |
| Major or premium renovation | Approximately $3,500–$5,500+ per m² | Structural alterations, extensive new services, detailed finishes, difficult access or substantial rebuilding. |
These are general planning figures, not a Kenne quotation. Prices change with design, market conditions, site constraints and selected materials.
Seven factors that influence the final price
1. The existing condition of the home
Older Sydney houses can conceal deterioration, outdated wiring, plumbing problems, asbestos-containing materials, water damage or structural movement. Some conditions only become visible after demolition. A pre-construction inspection helps, but it cannot reveal every concealed issue.
2. Structural changes
Removing load-bearing walls, creating large openings or changing roof structures requires engineering and additional labour. These decisions generally cost more than updating finishes within the existing layout.
3. Kitchen and bathroom work
Wet areas concentrate plumbing, waterproofing, electrical work, cabinetry, stone, tiling and fixtures into a small area. Moving the kitchen or bathroom can add further service and structural work.
4. Access and site conditions
A narrow driveway, limited material storage, restricted working hours, steep land or an occupied home can affect labour and delivery costs. Sydney sites often require careful staging because space is limited.
5. Selections and finishes
Flooring, windows, appliances, tapware, tiles and custom joinery can change a budget considerably. Choosing key items before pricing reduces allowances and makes quotations easier to compare.
6. Approvals and professional services
Depending on the work, you may need planning approval, a complying development certificate or development application, construction approval and a certifier. Design, engineering, surveying, BASIX and specialist reports may also be required.
7. Living arrangements during construction
Remaining in the house may appear cheaper than temporary accommodation, but it can make staging, safety and site access more complicated. Discuss the practical implications with your builder early.
Costs homeowners commonly overlook
- Design, engineering, surveying and certification fees
- Demolition, waste removal and hazardous-material testing
- Temporary protection, fencing and site facilities
- Electrical-board, drainage or water-service upgrades
- Temporary accommodation and storage
- Landscaping, driveways and external works
- Window coverings, loose furniture and appliances outside the contract
- Changes requested after construction begins
How much contingency should you allow?
A renovation carries more uncertainty than a clear-site new build because the existing structure must be opened and connected to new work. Many homeowners allow a contingency of around 10–20% during early planning, with the appropriate amount depending on the building’s age, investigations completed and certainty of the design.
Contingency is not an invitation to spend more. It is a financial buffer for legitimate unknowns or carefully considered changes.
Preparing for a meaningful quotation
- A clear written description of the result you want
- Measured drawings or design documentation appropriate to the project stage
- A realistic overall budget, including professional fees and contingency
- A preliminary list of finishes, fixtures and appliances
- Available property information, surveys and existing approvals
- Questions about inclusions, exclusions, allowances and variations
A very low early estimate is not necessarily the best value. Compare quotations on the same documents and examine what each builder has included. In NSW, residential work is also subject to contract, licensing and insurance requirements that vary with the value and nature of the work.
What should you do next?
Begin by defining your must-haves, preferred completion standard and comfortable budget range. Then speak with a licensed builder before the design becomes too advanced. Early construction input can identify difficult details, missing allowances and opportunities to simplify the build.